Construction/Demolition (Construction Inspection): Osan AB, Korea

Title II HVAC, Osan AB, Korea
Construction and DemolitionOTIE delivered Title II Mechanical System oversight at Osan Air Base, South Korea under contract with the Air Force Civil Engineer Center (AFCEC) to assist the USACE Far East District and Osan AB Civil Engineer Squadron in the housing project management of MFH units in two high-rise towers. We performed supervision, inspection, and oversight of the mechanical systems for 111 MFH units for Phase 2 and 117 MFH units for phase 3, with a construction performance period of 500 days for each phase.
Working with the construction contractor and the government agency representatives, OTIE provided that all included HVAC systems were properly commissioned and operating correctly prior to final project completion and acceptance by the government. The HVAC systems included emergency backup power generation fueled by diesel fuel stored in two new 8,000 gallon ASTs that were concrete encased, and double-walled.
Client Name: AFCEC


Location: Osan AB, Republic of Korea


Contract Value: $1.8M


Project Features:

  • Delivered Title II mechanical system oversight
  • Performed inspection for 111 MFH units for Phase 2 and 117 MFH units for Phase 3