Construction/Demolition (Design/Build): Camp Roberts, CA

HVAC System Removal and Replacement and Asbestos Abatement, Camp Roberts, CA
Construction and DemolitionOTIE managed design/build for installation of high-efficiency HVAC equipment upgrades in 110 buildings. OTIE followed LEED™ criteria using value engineering approach to compare the life-cycle costs of repair vs. the replacement with new units. OTIE’s engineering economy analysis predicted high-efficiency HVAC units would cut energy use by 50% and save $30,000/year—actual savings of nearly $80,000 in the first 2 years. Client Name: California Air National Guard


Location: Camp Roberts, CA


Contract Value: $950K


Project Features:

  • OTIE cleaned existing duct systems to remove particulates and debris including mold and asbestos
  • Performed a value engineering and energy efficiency study to evaluate installation of energy-efficient HVAC equipment